Faculty of Science and Technology

Intro

Facility 360

Location

The Faculty of Science and Technology building was built on 1st  December 2009 with an area of ​​13796.1m2. This 6-storey building began its operation on 28th  November 2011.

Equipped with various facilities including:

  • 2 Faculty Lecture Halls (DKF)
  • 23 Tutorial Rooms
  • 4 Lecture Rooms / Examination Hall
  • Biology Lab
  • Bio-technology Lab
  • Chemistry Lab
  • Applied Physics Lab
  • Bakery Technology Lab
  • Food Processing Technology Lab
  • Food Technology Lab
  • Sensor Analysis Lab
  • 12 Computer Labs
  • 2 Learning Spaces
TOP